Applied Projects

B.A.S. for CHP with Microturbine for Heating and DHW Systems

Aurora Condo

14924 Yonge Street, Aurora, ON (2008)

Building : Senior Residential Condo

Number of Control points : 34

Equipment and capacity :  One (1) 65 kW Capstone® Microturbine , two (2) Hydronic Plate Heat Exchanger

Protocol : LonWORKS

Description :

Design , Supply , programming and installation of controls for a CHP system to provide 60 kW electrical power and heating of  DHW system, integrating a 60 kW Capstone Micro-Turbine and two (2) 230 KBtu/hr plate heat exchangers with  Distech Controls controller for a 12 Floor condo building.

B.A.S.  for Maple Grove PS with Thermo-mass HVAC System

Maple Graves PS

288 Maple Grove Dr., Oakville, ON Halton (2011)

Building : Public School

Number of Control points : 305

Equipment and capacity :  4 RTUs with Heat Recovery Wheel, Slab Radiant Floor by Thermobuild ®

Protocol : LonWORKS and Niagara AX

Description : 

Design , Supply , programming and installation of a B.A.S. controls for the operation and monitoring  of a Thermomass HVAC system consisted of Four( 4)  RTU units,  with Heat recovery Wheel, temperature monitoring and control of the concrete slabs , power and gas consumption and control of supplementary radiation Heaters.

B.A.S.  for Mary Ward HS HVAC System with VAVs

Mary Ward HS

3200 Kennedy Road, Toronto, ON (2012)

Building : Public School

Number of Control points : 592

Equipment and capacity :  4 RTUs with Heat Recovery Wheel, Slab Radiant Floor by Thermobuild ®

Protocol : LonWORKS and Niagara AX

Description : 

Design , Supply , programming and installation of a B.A.S. controls for the operation and monitoring  of a Thermomass HVAC system consisted of Four( 4)  RTU units,  with Heat recovery Wheel, temperature monitoring and control of the concrete slabs , power and gas consumption and control of supplementary radiation Heaters.

B.A.S. for ST_Edward CES Radiant Floor Heating System with ACS and VAVs.

ST Edward

1 Botham Rd., North York, ON (2013)

Building : Public School

Number of Control points : 455

Equipment and capacity :  3 ACSs with Heat Recovery Wheel, Two Heating Boilers for Hydronic Radiant Floor and 10 VAVs boxes.

Protocol : LonWORKS and Niagara AX

Description : 

Design , Supply , programming and installation of a B.A.S. controls for the operation and monitoring  of a HVAC system consisted of Three( 3)  ACS units,  with Heat recovery Wheel, temperature monitoring and control of the radiant floor heating for different areas in a Elementary School of the Toronto Catholic District School Board TCDSB.

B.A.S. to control four (4) 30 Tons Chillers, for the cooling of a Main Church Auditorium

ELSP

Bogota City, Colombia (2015)

Building: Christian Church

Number of Control points: 325

Equipment and capacity:  four (4) 30 Tons Chillers, twelve (12) AHUs and seven (7) EFs

Protocol: Lon WORKS

Description : Design , supply , Installation and Balancing of  120 Tons cold water  Air Conditioning system with four (4) Chillers  of 30 T.R. ea. , twelve (12) Air Handling Units of 10 T.R. ea., Extraction System with seven (7) extractors for a total of 28000 CFM and Monitoring and control system B.A.S. Building Automation System with Lon WORKS Brand Distech-Controls .

This system was designed to take advantage of the external temperatures of the city during all the year which are between 13ºC and 24ºC, lower than those generated by the internal thermal load. This accompanied by zone control system through 3-way valves per Air Handler Unit and strategically installed temperature sensors,  allow to obtain a double benefit that are renewed air 100% for the occupants and energy savings of up to 40% compared to a traditional system with air recirculation at 100%.

B.A.S. for Saint Joseph University Hospital for Clean Room with Positive + and Negative pressure with and VAVs

HUSJ

Popayán City , Colombia (2018)

Building : State Hospital

Number of Control points : 290

Equipment and capacity :  6 AHUs, with VAVs Boxes

Protocol : BacNET and Niagara N4

Description :

Design, Supply and Installation of six (6) AHUs  of 4500 CFM ea , with direct expansion cooling  for a total of 750000 Btu/Hr of cooling capacity and 10.0 kW  electrical resistance for heating to maintain clean room conditions  at ISO 7 and ISO 8 levels,  through air renewals (ACH) according to ASHARAE 70.0 standard, adjustment of  areas at positive and/or  negative  pressures in the same assigned areas and comfort by temperature and relative humidity control. This is supported by a DDC-type central control system with BacNET protocol , at different areas such as  delivery rooms, neonates ICU, pediatric ICU, adult area ICUs, Clinical  Laboratory and Special Samples Lab.

B.A.S. Maintenance and Restoration Total A/C System and CIC cooling System for Cotecmar and the Colombian National Army

HVAC MARINE

Cartagena D.T. y C. , Colombia (2012)

Building : ARC Pijao y ARC Tayrona

Equipment and capacity : A. Air Handling Units (UMA) with VAV (Variable Air Volume 70 TR)

Description :

Design applied to medium displacement ships , where control by independent zones is critical to provide an optimum level of comfort to each occupant and compartment.

Installation and commissioning of a Chiller cooling system for navigation and combat equipment according to the supplied specifications and design for the German shipyard HDW, ensuring full completion and successful initiation in accordance with their high European standards.